Hi,

In regards to the scheduled maintenance.. Unfortunately we encountered a few unforeseen issues that set us back yesterday. However, we are about 80% complete with the work needed in order to restore services. We are fairly confident that Talon2 will be back online this afternoon/evening. Please standby for updates..

To give a scope of the work already accomplished:

- > 200 fiber cables were individually prepared and labeled

- > 100 fiber cables had to be untangled, sorted, and tested

- > 100 core-to-leaf underground cables have been run and connected

- 10 Infiniband leaves (edge switches) have been installed and configured

- 2 new Infiniband cores (central switches) have been installed, configured, and connected

- 1 Infiniband core was moved, configured, and connected